FREE PAINTING CONTRACTOR TOOL

Cabinet Painting Cost Calculator

Estimate cabinet painting prices from doors, drawers, boxes, finish quality, prep, and labor rate.

01

Set up your calculation

Changing finish loads editable starting hours in the assumptions below.

Light ×0.85, standard ×1, heavy ×1.35. Adjusts preparation hours; gallons stay the same.

02

Make the numbers yours

Wage plus payroll burden. Overhead and profit are added separately below. ($ / hr)

(USD)

Allocate insurance, vehicle, office, and other overhead. Zero excludes these costs. (USD)

The share of your selling price remaining after the costs you enter. (%)

Advanced assumptions

Editable starting values. Match production rates to your process and check the products you will use.

Both sides, all finish coats. Adjust for your process. (hr)

Front only, all finish coats. (hr)

Exposed faces; interiors require additional time. (hr)

Base hours for cleaning, sanding, masking, removal, and refitting. The prep factor applies here. (painter-hours)

USD · square feet · US gallons

Your inputs stay in this browser tab, including when switching languages. Reset clears them.

Your result$7,154View breakdown

KNOW THE MATH

A number you can explain.

Hours = doors × hours per door + drawer fronts × hours per front + boxes × hours per box + preparation/setup. Price = total entered costs ÷ (1 − target margin).

Our methodology & assumptions
WORKED STARTING EXAMPLE

$7,154

Painter-hours
57 hr
Labor cost
$4,275.00
Materials + equipment
$375.00
Allocated overhead
$0.00
Total job cost
$4,650.00
Profit after overhead · base
$2,503.85
  1. Finishing hours: 18 doors × 1.5 + 8 drawer fronts × 1 + 10 boxes × 1.8.
  2. Prep/setup: 4 base hours × 1. Door hours cover both faces; boxes cover exposed faces. Include all finish coats in your per-item hours.
  3. Price = entered costs ÷ (1 − 35% margin).

Before you quote

What does each cabinet count include?

Doors include both painted faces, drawers mean drawer fronts, and boxes mean exposed faces. Add labor for interiors, repairs, unusual profiles, and other work outside that scope.

Are the finish presets industry standards?

They are editable starting examples. Changing the finish loads per-item hours in Advanced assumptions. Replace them with your own all-coats finishing time; include cleaning, sanding, masking, removal, and reinstallation in prep/setup.

Does this predict the project schedule?

It estimates total painter-hours. Drying, curing, travel, shop capacity, and crew coordination affect elapsed time. Plan those separately before promising a completion date.

Estimating framework: Painting Contractors Association. This tool's starting values are editable examples, not rates published by PCA.